+86 13812852226    |         sales@aceretech.com
News
Home » News » Industry News » Plastic Washing Line Electrical Equipment Maintenance

Plastic Washing Line Electrical Equipment Maintenance

Views: 16     Author: Site Editor     Publish Time: 2023-04-27      Origin: Site

Inquire

facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
sharethis sharing button
Plastic Washing Line Electrical Equipment Maintenance

The plastic washing line electrical equipment maintenance process details the plastic washing line maintenance methods or steps. It also claims operators are in operation after the timely maintenance and repair of electrical equipment. The following are the maintenance of each electrical equipment instruction. Maintenance personnel can operate according to this.


Here is the content:


  • Transformer

  • High-voltage switchgear

  • Low-voltage distribution cabinet, central signal screen, DC screen

  • Motor and start control cabinet, power distribution box


Transformer


1、Annually clean up one - timer the appearance of plastic washing line dust and other dirt and tighten the conductor connection bolts.

2, If it stops running for more than 72 hours, before putting it into operation again should do an insulation test. Measured with a 2500V shaking table, once on the second and to the ground ≥ 300M2. The second to the ground ≥ 100MQ, core to the ground ≥ 5MQ (note the removal of the grounding piece). If you cannot reach it, should do the dry treatment.

3, a monthly inspection of the on-load regulator switch: check whether the switch's native terminals are corona phenomenon (blue and red-light flashing) when the light is dark. If there is, the plastic washing line must be wiped clean with degreasing cotton yarn after power failure.


High-voltage switchgear


1, They daily must be regularly patrolled, and check whether the cabinet connection bolts are loose.

2, once a year clean up the cabinet inside and outside the accumulated dust and dirt. Tighten the conductor connection bolts, the circuit breaker, and other operating mechanisms filled with lubrication

Oil.

3, We need to do a high-voltage preventive test for the plastic washing line.


Low-voltage distribution cabinet, central signal screen, DC screen


1、Check and calibrate the ammeter and voltmeter every year to see if they are accurate and reliable.

2、Check the insulation parts for damage and moisture every month. The connection of protection grounding is reliable.

3、Check monthly whether the auxiliary circuit components, including instruments, relays, control switch buttons, protection fuses, etc. are normal.

4、Monthly check whether the auxiliary circuit terminals and connectors are solid and reliable.

5、Monthly check whether it is in normal working condition and whether the signal indication is accurate. Check whether the DC screen animal battery is normal,

Check the liquid level and measure the specific gravity when necessary.

6、Annually clean up the plastic washing line inside and outside the cabinet with dust and dirt and tighten the wire connection bolts. Check the aging of the lead wire.


Motor and start control cabinet, power distribution box


1、Check daily:

A. Whether the motor of the plastic washing line is running normally and whether there is any strange noise;

B. Whether the motor shell temperature is normal;

C. Whether the instrument and indicator on the starting control cabinet are normal;

D、Start the standby motor, test run for about 5 minutes, and check if there are any abnormalities.

2、Weekly inspection:

A, check the starting control cabinet AC contactor, time relay, and thermal relay. And intermediate relay action is reliable, and its contact wears condition. And its contact wear condition, if necessary, give replacement.


At present, our plastic washing line technology has developed and mature. The degree of intelligence of automatic diagnosis is very high and gradually tends to be in line with the international standard. Our excellent quality, innovative design, reasonable price, and perfect after-sales service have won our customers' full trust and praise.


Quick Quote

Quick Links

Product Category

Contact Us

Add:18# Yuefeng road, Nanfeng town, Zhangjiagang city. Jiangsu province, China

Tel: +86-512-58622021
Email: sales@aceretech.com
Quick Quote

  Copyrights 2022 Jiangsu Aceretech Machinery Co., Ltd.  All rights reserved.       sitemap | support by Leadong     

ICP备案号:苏ICP备2022010828号-1